KWKWKWKW

Karawitz

  • Studio
    • Philosophy
    • Team
    • Awards, exhibitions and conferences
    • Publications
    • Contact
  • News
  • Projects
    • Houses
    • Housing Projects
    • Refurbishment
    • Abroad
    • Public Projects
    • Hospitality
    • Office Projects
    • Furniture
  • Englishen
  • Françaisfr

News 04/02/2021

Passi’Bat 2021 – Presentation of the ten-year assessment of a passive renovation

During the Passi’Bat 2021 conference, Karawitz presented the ten-year assessment of the Rénopassive operation. Despite the heat waves, the house shows 0% overheating beyond 25°C. The interior temperature is stable and the consumption is in line with the calculations.

 


  • Email
  • Facebook
  • Links
  • Credits and Legal Notice
  • Studio
    • Philosophy
    • Team
    • Awards, exhibitions and conferences
    • Publications
    • Contact
  • News
  • Projects
    • Houses
    • Housing Projects
    • Refurbishment
    • Abroad
    • Public Projects
    • Hospitality
    • Office Projects
    • Furniture
Links - Liens
  • Email
  • Facebook
  • Links
Lang.
  • Englishen
  • Françaisfr